home
> wind farms
Lac-Alfred wind farm (Phase I)
Date Installed: 2013/01
Turbines: 75x REpower MM82 (24) MM92 (51)
Total Installed Capacity (MW): 150.0000
Company: EDF EN Canada Inc.
Address: , Gaspesie Peninsula, between the cities of Mont-Joli and Amqui, QC, , Canada
Description:
|