Welcome to the CanWEA wind farm
database: a comprehensive list on wind energy projects in
Canada.
| Wind/Farm/Site |
Province |
Date Installed |
Turbines / Total Installed Capacity |
Company |
Castle River Wind Farms
|
AB |
1997/11 |
1x Vestas V44-600 (600 kW) / 0.6000 (MW)
|
TransAlta |
Cowley Ridge North Wind Farm
|
AB |
2001/10 |
15x Nordex 1,300 kW / 19.5000 (MW)
|
TransAlta |
Chin Chute Wind Farm
|
AB |
2006/11 |
20x 1.5 MW GE / 30.0000 (MW)
|
Suncor / Acciona / Enbridge |
Kettles Hill Phase I
|
AB |
2006/03 |
5x Vestas 1.8 MW / 9.0000 (MW)
|
Enmax |
Kettles Hill Phase II
|
AB |
2007/07 |
30x Vestas V80 1.8 MW / 54.0000 (MW)
|
Enmax |
Lundbreck
|
AB |
2001/12 |
1x Enercon E40 600kW / 0.6000 (MW)
|
Lundbreck Developments Joint Venture A |
Magrath
|
AB |
2004/09 |
20x 1.5 MW GE Wind / 30.0000 (MW)
|
Suncor, Enbridge, EHN |
McBride Lake
|
AB |
2003/06 |
114x Vestas 660 kW / 75.2400 (MW)
|
ENMAX / TransAlta |
McBride Lake East
|
AB |
2001/12 |
1x Vestas V47 660 kW / 0.6600 (MW)
|
TransAlta |
Old Man River Project
|
AB |
2007/03 |
2x Vestas V80 1.8 MW / 3.6000 (MW)
|
Alberta Wind Energy Corp. |
Sinnott Wind Farm
|
AB |
2001/11 |
5x Nordex 1,300 kW / 6.5000 (MW)
|
TransAlta |
Soderglen Wind Farm
|
AB |
2006/10 |
47x GE 1.5 MW / 70.5000 (MW)
|
Nexen / TransAlta |
Summerview Wind Farm
|
AB |
2002/04 |
1x 1.8MW / 1.8000 (MW)
|
TransAlta |
Summerview Wind Farm
|
AB |
2004/09 |
38x Vestas 1.8 MW / 68.4000 (MW)
|
TransAlta |
Taber Wind Farm
|
AB |
2007/09 |
37x Enercon E70 2.2 MW / 81.4000 (MW)
|
ENMAX |
Optimist Wind Energy Wind Farm
|
AB |
2004/01 |
1x Lagerway 750 kW / 0.7500 (MW)
|
Optimist Wind Energy |
Taylor Project
|
AB |
2004/01 |
9x Kenetech 375 kW / 3.3800 (MW)
|
TransAlta |
Waterton Wind Turbines
|
AB |
1998/11 |
1x Vestas 600kW; 1998 - 2x Vestas 600kW; 2000 - 1x Vestas 660 kW; 2001 - 1x Vestas 660 kW; 2002 - 1x Vestas 660 kW / 3.7800 (MW)
|
TransAlta |
Weather Dancer 1
|
AB |
2001/09 |
1x NEG-Micon 900 kW / 0.9000 (MW)
|
Epcor/Peigan Nation Reserve |
Castle River Wind Farm
|
AB |
2000/01 |
15x Vestas V47 660kW / 9.9000 (MW)
|
TransAlta |
Castle River Wind Farm
|
AB |
2001/01 |
44x Vestas V47 660kW / 29.0400 (MW)
|
TransAlta |
Cowley Ridge
|
AB |
1993/1994 |
57 x Kenetech 375 kW turbines / 21.4000 (MW)
|
TransAlta |
Blue Trail Wind Farm
|
AB |
2009/11 |
22 x Vestas 3 MW turbines / 66.0000 (MW)
|
TransAlta |
Summerview 2 Wind Farm
|
AB |
2010/02 |
22 x Vestas 3 MW / 66.0000 (MW)
|
TransAlta |
Ardenville Wind Farm
|
AB |
2010/Q4 |
23 x Vestas V90 3MW / 69.0000 (MW)
|
TransAlta |
Ghost Pine Wind Farm
|
AB |
2010/12 |
51 x GE 1.6 / 81.6000 (MW)
|
NextEra |
Wintering Hills
|
AB |
2011/12 |
General Electric x 55 / 88.0000 (MW)
|
Suncor |
Optimist Wind Energy Wind Farm
|
AB |
1993 |
Bonus 150 kW / 0.1500 (MW)
|
Optimist Wind Energy |
Castle Rock Wind Farm
|
AB |
2012/05 |
33 x Enercon / 75.9000 (MW)
|
Enel |
Halkirk Wind
|
AB |
2012/12 |
83x Vestas V90-1.8 / 149.4000 (MW)
|
Capital Power Corporation |
Bear Mountain Wind Park
|
BC |
2009/11 |
34 Enercon 3MW / 102.0000 (MW)
|
Bear Mountain Wind LP |
The Eye of the Wind Turbine
|
BC |
2010/02 |
1 x 1.5 MW Leitwind turbine / 1.5000 (MW)
|
Grouse Mountain Resorts Limited |
Dokie Wind Project
|
BC |
2011/02 |
Vestas V-90 / 144.0000 (MW)
|
Dokie General Partnership |
Quality Wind
|
BC |
2012/11 |
79x Vestas 1.8MW V90(35) V100 (44) / 142.2000 (MW)
|
Capital Power Corporation |
St. Leon Project
|
MB |
2005/07 |
12x Vestas NM 82 1.65 MW / 19.8000 (MW)
|
Algonquin Power Income Fund |
St. Leon Project - Phase 2
|
MB |
2006/03 |
51x Vestas NM 82 1.65 MW / 84.1500 (MW)
|
Algonquin Power Income Fund |
St. Joseph
|
MB |
2011/02 |
60 x Siemens 2.3 MW / 138.0000 (MW)
|
Pattern Energy |
Kent Hills
|
NB |
2008/12 |
32 X 3MW Vestas turbines / 96.0000 (MW)
|
TransAlta and Natural Forces Technologies Inc. |
Caribou Wind Park
|
NB |
2009/11 |
33 X 3 MW Vestas turbines / 99.0000 (MW)
|
GDF Suez |
Kent Hills - Expansion
|
NB |
2010/Q4 |
18 x Vestas V90 3MW / 54.0000 (MW)
|
TransAlta |
Lameque Wind Power Project
|
NB |
2011/03 |
30 x AWP77 / 45.0000 (MW)
|
Acciona Lameque GP Inc. |
Ramea
|
NF |
2004/10 |
6x 65 kW Windmatic WM15S / 0.3900 (MW)
|
Frontier Power Systems Inc. |
St.Lawrence Wind Farm
|
NF |
2008/11 |
9 X 3 MW Vestas turbines / 27.0000 (MW)
|
NeWind |
Fermeuse Wind Power Project
|
NF |
2009/05 |
9 x Vestas 3.0 MW / 27.0000 (MW)
|
SkyPower |
Ramea wind-diesel project
|
NF |
2010/06 |
3x100 kW Northwind 100B turbines / 0.3000 (MW)
|
Nalcor Energy |
Brookfield
|
NS |
2005/11 |
1x Turbowinds T-600 / 0.6000 (MW)
|
Renewable Energy Services Limited |
Digby Limited
|
NS |
2006/12 |
1x Enercon E48 800 kW / 0.8000 (MW)
|
Renewable Energy Services Limited |
Fitzpatrick Mountain
|
NS |
2006/12 |
1x Enercon E48 800 kW / 0.8000 (MW)
|
Renewable Energy Services Limited |
Fitzpatrick Mountain
|
NS |
2006/04 |
1x Enercon E48 800 kW / 0.8000 (MW)
|
Renewable Energy Services Limited |
Glace Bay & Donkin
|
NS |
2005/11 |
2x Enercon 800 kW / 1.6000 (MW)
|
Cape Breton Power |
Grand Etang
|
NS |
2002/10 |
1x Vestas V47-660 (660 kW) / 0.6600 (MW)
|
Nova Scotia Power |
Goodwood
|
NS |
2005/11 |
1x Turbowinds 600 kW / 0.6000 (MW)
|
Renewable Energy Services Limited |
Higgins Mountain Riverhurst
|
NS |
2006/12 |
3x Vensys 1.2 MW / 3.6000 (MW)
|
Vector Wind Energy/Spring Hill |
Lingan
|
NS |
2007/01 |
5x E70 2MW / 10.0000 (MW)
|
Cape Breton Power |
Lingan
|
NS |
2006/06 |
2x E70 2 MW / 4.0000 (MW)
|
Cape Breton Power |
Little Brook
|
NS |
2002/10 |
1x Turbowinds T600 / 0.6000 (MW)
|
Nova Scotia Power |
Marshville Limited
|
NS |
2006/12 |
1x Enercon E48 800 kW / 0.8000 (MW)
|
Renewable Energy Services |
Point Tupper
|
NS |
2006/04 |
1x Enercon E48 800 kW / 0.8000 (MW)
|
Renewable Energy Services Limited |
Pubnico Point - Phase 1
|
NS |
2004/01 |
2x Vestas 1.8 MW / 3.6000 (MW)
|
FPL Energy |
Pubnico Point - Phase 2
|
NS |
2005/01 |
15x Vestas 1.8 MW / 27.0000 (MW)
|
FPL Energy |
Springhill Project
|
NS |
2005/12 |
1x Vensys 1.2 MW / 1.2000 (MW)
|
Vector Wind Energy |
Springhill Riverhurst
|
NS |
2006/12 |
1x Americas Wind Energy / 0.9000 (MW)
|
Vector Wind Energy/Springhill |
Tiverton Riverhurst
|
NS |
2006/12 |
1x Americas Wind Energy / 0.9000 (MW)
|
Vector Wind Energy/Springhill |
Dalhousie Mountain project
|
NS |
2009/12 |
34 x GE Energy 1.5 MW / 51.0000 (MW)
|
RMSenergy |
Maryvale wind project
|
NS |
2010/02 |
4 x Vensys 1.5 MW turbines / 6.0000 (MW)
|
Maryvale Wind LP (a subsidiary of Horizon Legacy Energy Corporation) |
Point Tupper Wind Farm
|
NS |
2010/08 |
11 x Enercon 2.00 turbines / 22.0000 (MW)
|
Renewable Energy Services Ltd. and NS Power |
Digby Wind Farm
|
NS |
2010/12 |
20 x GE 1.5 MW / 30.0000 (MW)
|
Emera and Scotian WindFields |
Nuttby Wind Farm
|
NS |
2010/12 |
22 x Enercon / 50.6000 (MW)
|
Nova Scotia Limited |
Watts Wind
|
NS |
2011/03 |
1 x Vensys V77 / 1.5000 (MW)
|
Watts Wind Inc. |
Glen Dhu
|
NS |
2010/12 (9 commissioned) 2011/03 (18 commissioned) |
27 x Enercon E-82, E2 / 62.1000 (MW)
|
Shear Wind |
Spiddle Hill Phase I
|
NS |
2011/07 |
Enercon E53 / 0.8000 (MW)
|
Colchester-Cumberland Wind Field Inc. |
Amherst I Wind Farm
|
NS |
2012/04 |
15 x Suzlon S-97 / 31.5000 (MW)
|
Sprott Power |
Fairmont Wind Farm
|
NS |
2012/11 |
2x Enercon E-82 2.3MW / 4.6000 (MW)
|
Wind4All/Natural Forces |
Lingan II
|
NS |
2012/10 |
1x Enercon E-82 / 2.3000 (MW)
|
Sprott Power Corp |
Fairmont Wind Farm
|
NS |
2012/11 |
2x Enercon E-82 / 4.6000 (MW)
|
Wind4All/Natural Forces |
Diavik Mine Wind Farm
|
NT |
2012/10 |
4x Enercon E70 2.3MW / 9.2000 (MW)
|
Rio Tinto and Harry Winston Diamond Corp |
Ravenswood Wind Farm
|
ON |
2008/01 |
6x Vestas 1.65 Mw / 9.9000 (MW)
|
Sky Generation |
Dunnville Wind Turbine
|
ON |
2006/10 |
1x Pfleiderer 650 kW / 0.6500 (MW)
|
Rosa Flora Limited |
Erie Shores Wind Farm
|
ON |
2006/05 |
66x GE 1.5 MW / 99.0000 (MW)
|
Macquarie Power & Infrastructure Income Fund |
Ferndale Wind Farm
|
ON |
2002/11, 2006/10 |
1x Vestas 1.8 MW, 2x Vestas 1.65 MW / 5.1000 (MW)
|
Sky Generation |
Huron Wind
|
ON |
2002/11 |
5x Vestas 1.8 MW / 9.0000 (MW)
|
Huron Wind |
Kingsbridge 1 Wind Power Project
|
ON |
2006/04 |
22x Vestas 1.8 MW / 39.6000 (MW)
|
Capital Power |
Melanchton 1 Wind Plant
|
ON |
2006/03 |
45x 1.5 MW GE / 67.5000 (MW)
|
TransAlta |
Port Albert Wind Turbine
|
ON |
2001/12 |
1x Vestas V47 (660 kW) / 0.6600 (MW)
|
Private |
Prince Wind farm
|
ON |
2006/11 |
126x GE 1.5 MW / 189.0000 (MW)
|
Brookfield Renewable Power |
Providence Bay Wind farm
|
ON |
2007/02 |
2x Enercon E48 800 KW / 1.6000 (MW)
|
Schneider Power |
Tiverton Wind Turbine
|
ON |
1995/10 |
1x Tacke TW-600 CWM (cold weather modified, 600 kW) / 0.6000 (MW)
|
Ontario Power Generation |
Ex Place Turbine
|
ON |
2003/01 |
1 Lagerway 750 kW / 0.7500 (MW)
|
Toronto Hydro/Windshare |
Cultus Wind Project
|
ON |
2008/07 |
6x Vestas V82 1.65 MW / 9.9000 (MW)
|
International Power Canada, Inc. |
Frogmore Wind Project
|
ON |
2008/07 |
6 Vestas V82 1.65 MW / 9.9000 (MW)
|
International Power Canada, Inc. |
Ripley Wind Power Project
|
ON |
2007/12 |
38 x Enercon 2 MW turbines / 76.0000 (MW)
|
Suncor Energy Products Inc./Acciona Energy |
Mohawk Point Wind Farm
|
ON |
2008/10 |
6 x Vestas 1.65 MW turbines / 9.9000 (MW)
|
International Power Canada, Inc. |
Port Alma Wind Farm
|
ON |
2008/11 |
44 Siemens 2.3 MW Mk II Wind Turbines / 101.2000 (MW)
|
Kruger Energy |
Clear Creek Wind Farm
|
ON |
2008/11 |
6 x Vestas 1.65 MW / 9.9000 (MW)
|
International Power Canada, Inc. |
Melancthon Phase II
|
ON |
2008/11 |
88 x GE Energy 1.5 MW turbines / 132.0000 (MW)
|
TransAlta |
Cruickshank Wind Farm
|
ON |
2008/10 |
5 x Vestas 1.65 MW turbines / 8.2500 (MW)
|
Enbridge |
Ontario Wind Power Wind Farm
|
ON |
2009/04 |
110 x Vestas 1.65MW (V-82) / 181.5000 (MW)
|
Enbridge |
OPG 7 Gomberg Turbine
|
ON |
2001 |
1.8MW Vestas / 1.8000 (MW)
|
Ontario Power Generation |
Wolfe Island EcoPower Centre
|
ON |
2009/06 |
86 Siemens 2.3 MW Wind Turbines / 197.8000 (MW)
|
TransAlta |
Proof Line Wind Farm
|
ON |
2009/12 |
4 X 1.65 MW Vestas turbines / 6.6000 (MW)
|
Sky Generation |
Thames River project
|
ON |
2010/02 |
20 x Enercon 2 MW / 40.0000 (MW)
|
Boralex Inc. |
Harrow Wind Project
|
ON |
2010/06 |
24 x Vestas 1.65 MW / 39.6000 (MW)
|
International Power Canada |
Gosfield Wind facility
|
ON |
2010/10 |
22 x 2.3-101 MW / 50.6000 (MW)
|
Brookfield Renewable Power |
Talbot Wind Farm
|
ON |
2010/12 |
43 x Siemens 2.3-101 MW / 98.9000 (MW)
|
Enbridge/RES |
Naylor Wind Farm
|
ON |
2010/12 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Boralex Inc. |
Richardson Wind Farm
|
ON |
2010/12 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Boralex Inc. |
North Maiden Wind Farm
|
ON |
2011/01 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Boralex Inc. |
South Side Wind Farm
|
ON |
2010/12 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Boralex Inc. |
Gracey Wind Farm
|
ON |
2010/12 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Boralex Inc. |
Arthur Wind Farm
|
ON |
2010/12 |
5 x Enercon 2 MW / 10.0000 (MW)
|
Schneider Power Inc. |
Kruger Energy Chatham Wind
|
ON |
2011/01 |
Siemens SWT-2.3-101 & 2.3-93 / 101.2000 (MW)
|
Kruger Energy |
Raleigh Wind Power Partnership
|
ON |
2011/01 |
52 x General Electric 1.5MW / 78.0000 (MW)
|
Invenergy LLC |
Kent Breeze Wind Farm
|
ON |
2011/05 |
General Electric 2.5 MW / 20.0000 (MW)
|
Suncor Energy Inc. |
Greenwich Renewable Energy Project
|
ON |
2011/11 |
43 x Siemens / 98.9000 (MW)
|
Enbridge/RES Canada |
Pointes Aux Roches
|
ON |
2011/12 |
Vestas V90 x 27 / 48.6000 (MW)
|
International Power/GDF Suez |
Comber East
|
ON |
2011/12 |
Siemens 2.3-MW SWT-2.3-101 x 36 / 82.8000 (MW)
|
Brookfield |
Comber West
|
ON |
2011/12 |
Siemens 2.3-MW SWT-2.3-101 x 36 / 82.8000 (MW)
|
Brookfield |
Grand Valley Wind Farm (Phase I & II)
|
ON |
2012/04 |
9x Siemens SWT-2.3-101 / 19.8000 (MW)
|
Greta Energy Inc. |
Plateau I&II
|
ON |
2012/03 |
12x General Electric 1.5 XL / 18.0000 (MW)
|
International Power/GDF Suez |
Plateau III
|
ON |
2012/04 |
6x General Electric 1.5 XL / 9.0000 (MW)
|
International Power/GDF Suez |
Mother Earth Renewable Energy Project Phase I
|
ON |
2012/09 |
2x Enercon E-82 / 4.0000 (MW)
|
MERE General Partner Inc, wholly owned subsidiary of the M Chigeeng First Nation |
Conestogo Wind Energy Centre
|
ON |
2012/12 |
10x Siemens SWT-2.3-101/SWT-2.21-101 / 22.9200 (MW)
|
NextEra Energy Canada, ULC |
CAW Wind Turbine
|
ON |
2013/03 |
1 x Enercon E-48 / 0.5000 (MW)
|
Canada Auto Workers (CAW) |
Vestas Prototype
|
PE |
2004/01 |
1x Vestas V90 3 MW / 3.0000 (MW)
|
TransAlta |
Aeolus Wind Farm
|
PE |
2003/08 |
1x Vestas V90 / 3.0000 (MW)
|
Aeolous PEI Wind |
Eastern Kings Wind Farm
|
PE |
2007/01 |
10x Vestas V90 3 MW / 30.0000 (MW)
|
PEI Energy Corporation |
North Cape Wind Farm
|
PE |
2004/01 |
8x Vestas V47-660 (660 kW) / 5.2800 (MW)
|
Prince Edward Island Energy Corporation |
North Cape Wind Farm
|
PE |
2001/11 |
8x Vestas V47-660 (660 kW) / 5.2800 (MW)
|
Prince Edward Island Energy Corporation |
Norway Wind Park
|
PE |
2007/06 |
3 X Vestas V90 3 MW / 9.0000 (MW)
|
Suez Renewable Energy NA |
West Cape Wind Farm
|
PE |
2007/05 |
11x Vestas V80 1.8 MW / 19.8000 (MW)
|
Suez Renewable Energy NA |
West Cape Phase 2
|
PE |
2009/08 |
44 x Vestas 1.8 MW turbines / 79.2000 (MW)
|
GDF Suez |
Summerside Wind Project
|
PE |
2009/12 |
4 x Vestas 3 MW / 12.0000 (MW)
|
|
WEICAN R&D Park
|
PE |
2013/04 |
5 x DeWind 9.2 / 10.0000 (MW)
|
WEICAN |
Baie-des-Sables
|
QC |
2006/11 |
73x GE 1.5 MW / 109.5000 (MW)
|
Cartier Wind Energy (BDS) |
Le Nordais (Phase 1 - Cap Chat)
|
QC |
1999/03 |
76x NEG-Micon NM750/48 (750 kW) / 57.0000 (MW)
|
TransAlta |
Le Nordais (Phase 2 - Matane)
|
QC |
1999/09 |
57x NEG-Micon NM750/48 (750 kW) / 42.7500 (MW)
|
TransAlta |
Matane
|
QC |
1998/01 |
3x NEG-Micon 750/44 (750 kW) / 2.2500 (MW)
|
Hydro-Québec |
Mont Miller Project
|
QC |
2005/06 |
30x Vestas V80 1.8 MW / 54.0000 (MW)
|
Northland Power Income Fund |
Mount Copper Project
|
QC |
2004/05 |
5x V80 1.8 MW / 9.0000 (MW)
|
FPL Energy |
Mount Copper Project (Phase 2)
|
QC |
2005/06 |
25x Vestas V80 1.8 MW / 45.0000 (MW)
|
FPL Energy |
Parc éolien du Renard
|
QC |
2003/09 |
3x Jeumont 750 kW J48c / 2.2500 (MW)
|
Groupement éolien Québecois |
Anse-à-Valleau
|
QC |
2007/12 |
67 x GE Energy 1.5 MW turbines / 100.5000 (MW)
|
Cartier Wind Energy |
Carleton Wind Farm
|
QC |
2008/11 |
73 x GE Energy 1.5 MW turbines / 109.5000 (MW)
|
Cartier Wind Energy |
Jardin d'Eole Wind Farm
|
QC |
2009/11 |
85 x GE Energy 1.5 MW / 127.5000 (MW)
|
Northland Power Income Fund |
Site Nordique Expérimental en Éolien CORUS (SNEEC)
|
QC |
2010/03 |
2 x 2.05 MW REpower turbines / 4.1000 (MW)
|
Technocentre Éolien |
Mont Louis
|
QC |
2011/09 |
67 x General Electric / 100.5000 (MW)
|
Northland Power |
Montagne-Seche
|
QC |
2011/11 |
39 x General Electric / 58.5000 (MW)
|
Innergex Renewable Energy Inc. |
Gros Morne Phase I
|
QC |
2011/11 |
67 x General Electric / 100.5000 (MW)
|
Cartier Énergie Éolienne |
Le Plateau Wind Power LP
|
QC |
2012/03 |
60 x Enercon E70 / 138.6000 (MW)
|
Invenergy LLC |
Saint-Robert-Bellarmin Wind Farm
|
QC |
2012/10 |
40x REpower 2MW turbines / 80.0000 (MW)
|
EDF EN Canada |
Parc éolien de Gros-Morne Sainte-Madeleine (Phase II)
|
QC |
2012/11 |
74x General Electric 1.5MW SLE / 111.0000 (MW)
|
Cartier Énergie éolienne (TransCanada 62% + Innergex 38%) |
Montérégie Wind Project
|
QC |
2012/12 |
44x Enercon E-82 / 101.2000 (MW)
|
Kruger Énergie Inc. |
Parc éolien du Massif du Sud
|
QC |
2013/01 |
75x REpower MM82 (31) MM93 (44) / 150.0000 (MW)
|
EDF EN Canada Inc. |
Lac-Alfred wind farm (Phase I)
|
QC |
2013/01 |
75x REpower MM82 (24) MM92 (51) / 150.0000 (MW)
|
EDF EN Canada Inc. |
New Richmond
|
QC |
2013/03 |
27 x Enercon E-82 E2 & 6 x Enercon E-82 E2.3 / 67.8000 (MW)
|
TransAlta |
Centennial Wind Power Facility
|
SK |
2006/02 |
83x Vestas 1.8 MW (90 MW On-line in 2005/12) / 149.4000 (MW)
|
SaskPower International |
Cypress Wind Power Facility
|
SK |
2001/09 |
9x Vestas V47 (660 kW) / 5.9400 (MW)
|
SaskPower International |
Cypress Wind Power Facility
|
SK |
2003/12 |
7x Vestas V47 660 kW / 4.6200 (MW)
|
SaskPower International |
Sunbridge
|
SK |
2001/09 |
17x Vestas V47-660 (660 kW) / 11.2200 (MW)
|
Suncor & Enbridge |
Red Lily Wind Energy Project
|
SK |
2011/02 |
Vestas V-82 / 26.4000 (MW)
|
Red Lily Wind Energy Partnership/Algonquin Power |
Haeckel Hill 1
|
YT |
1993/07 |
1x bonus 150 kW / 0.1500 (MW)
|
Yukon Energy Corporation |
Haeckel Hill 1
|
YT |
2000/11 |
1x Vestas V47 660 kW / 0.6600 (MW)
|
Yukon Energy Corporation |